AccueilGrue de portique → Double Girder Gantry Crane Manufacturers - 40 Ton Specifications Design

Double Girder Gantry Crane Manufacturers - 40 Ton Specifications Design

Double poutre du portique, suitable for open freight yards and along railway operations, because its large leg space, it is suitable for lifting large volumes of goods, and also can lift containers, its gantry frame is similar with grue de récipient.

40 Ton Double girder gantry crane design consists of gantry frame, trolley and crane long traveling mechanism, electrical system and other components. There also equipped with rail clamp, anchoring device, anemometer and corrective devices, etc. for outdoor work gantry crane.

40 Ton Double girder gantry crane design uses double beam and double track, single trolley treuil structure. Crane winch trolley part include main and auxiliary hoisting mechanism, each mechanism using separate transmission set. Main and auxiliary hoisting mechanism not only can independently complete lifting, but also can be coordinated to complete the work of flipping objects.

Gantry frame structure same with Un cadre de grue de portique, main girder, end girder, legs, saddles and lower cross beams are connected together by high strength bolts, using reaming bolts positioned on each flange plate, positioning marks have been completed before delivery. Its structure is similar with container gantry crane, which is more stable and firm.

To facilitate transport, handling and installation lifting on site, set with lugs and hanging holes on the crane main components for lifting. The intensity and location of these lugs and hanging holes are fully considering lifting safety and convenience.

40 Ton Double Girder Gantry Crane Traveling Mechanism

40 Ton Double Girder Gantry Crane traveling mechanism driving adopts motor drive the réducteur through couplings and transmission shafts, reducer drive the driving wheels, which is smooth and reliable. This structural arrangement is conducive to each driving system component installation, maintenance and removal.

40 Ton Double Girder Gantry Crane Trolley

40 Ton Double Girder Gantry Crane Trolley mainly consists of lifting mechanism, trolley frame and trolley traveling mechanism.

40 Ton Double Girder Gantry Crane Hoisting Mechanism

40 Ton Gantry Crane main and auxiliary hoisting mechanism arranged in the same trolley frame, each set up with separate driving device, main and auxiliary hoisting mechanism not only can independently complete lifting, but also can be coordinated to complete the work of flipping.

40 Ton Double Girder Gantry Crane Trolley Traveling

Trolley tracks using one whole railway that joints welding as integration, to ensure the trolley running well.

Trolley traveling driving type is same with the crane long traveling mechanism.

40 Ton Double Girder Gantry Crane Technical Parameter

Technical parameter is an indicator of the operational capability of 40 Ton Double Girder Gantry Crane, main parameters including: lifting capacity, lifting height, span, working level, working speed, etc., as shown in the drawings. Complete set of supporting components (such as reducer, motor, brake, etc.) operation and maintenance, please refer to the supporting manufacturing factory manual.

About Double Girder Gantry Crane Manufacturers

Dongqi Crane, as a professional équipement de levage manufacturer, provides customers with reliable quality and excellent performance of 40 ton double girder gantry cranes. This type of équipement de levage has the characteristics of high efficiency, stability, and safety, and is suitable for various industrial production and handling occasions.

The 40 ton double beam gantry crane produced by Dongqi Crane adopts high-quality materials and advanced manufacturing technology, which has excellent performance and long service life characteristics. In addition, Dongqi Crane also has a professional technical team to provide customers with comprehensive technical support and solutions.

Depuis sa création, la société a été adhérant à la philosophie d'entreprise de "pragmatique, efficace, excellent, et fort", luttant pour la survie par la qualité et le développement par la technologie, strictement la mise en œuvre les normes promulguées par l'état, et a successivement passé ISO9001 international de certification de système de qualité, ISO14004 de l'environnement système de gestion de la Certification, de la santé au travail ohsas 18001 système de management de la certification, de manière exhaustive l'amélioration de la gestion globale au niveau de l'entreprise. En 2012, une société de gestion a été embauché avec un salaire élevé à fournir sur le site d'orientation, de compétences de base telles que le soudage et l'assemblage à l'avancée de la technique des ponts roulants, des employés de la qualité et de la gestion méthodes et des processus pour mener à bien unifié et méticuleux de la formation, de sorte que le institutionnalisée et systématique du modèle de programme a été profondément enracinée dans le cœur du peuple. Le développement de l'équipe, a jeté une base solide. Dongqi société va sûrement aller à la gloire, sur la route de la grue et de l'industrie.

If you need more information or purchase a 40 ton double girder gantry crane, please visit our website or contact our customer service department.

Grue De Portique De Spécifications

Comment personnaliser les grues à portique de la Chine

Nous sommes un fabricant de la grue située en Chine, fournissant grue de personnalisation de services aux clients de grues. Si vous souhaitez personnaliser une grue de portique, vous pouvez laisser un message sur le site ou E-mail: sales010@cranesdq.com, dites-nous les informations suivantes, et notre directeur des ventes communiquera avec vous:

  • Capacité de levage (t): __ ?( La capacité nominale)
  • Hauteur de levage (m):__ ? (Hauteur de crochet centre à l'étage)
  • Span (m): __ ? (La Distance entre le rail du centre)
  • Vitesse de levage (m/min): __ ? ( Simple, Double, Variable)
  • Voyager distance (m): __ ? (La longueur du rail)
  • Travail duty: __ ? (Combien d'heures par jour? Combien de fois par heure?)
  • Quel matériel pour être soulevé: __ ?
  • Industriel de tension: __ ? ( comme :380V, 50Hz, 3ph )

Laisser un commentaire

Protégé avec IP Blacklist CloudIP Blacklist Cloud

Envoyer À Vos Besoins

    fr_FRFrench
    %d