Double Girder Bridge Cranes: Top Running vs. Underhung
1. Introduction to Double Girder Bridge Cranes
Double girder bridge cranes represent the pinnacle of industrial lifting technology, offering superior strength, durability, and performance compared to single girder alternatives. As a leading manufacturer, Dongqi Crane provides both top running double girder bridge cranes and underhung double girder bridge cranes to meet diverse material handling needs across industries.
Key Advantages of Double Girder Design
Higher load capacities (5-500+ tons)
Increased hook height for better vertical clearance
Enhanced stability with dual load-bearing beams
Longer service life in heavy-duty applications
Greater customization options for specialized needs
2. Top Running Double Girder Bridge Cranes
2.1 Design & Construction Features
Dongqi’s top running double girder bridge cranes feature:
Robust box girder construction with FEM-standard steel
Heavy-duty end trucks with forged steel wheels
Precision-aligned runway systems
Modular design for easy installation and maintenance
2.2 Technical Specifications
Parameter Specification Range Capacity 5-500+ tons Span 10-40 meters Lifting Height 6-30 meters Work Class FEM 1Am-4m Operating Speed 5-30 m/min (adjustable) Control Options Pendant/Radio/Cabin
2.3 Pricing Structure
Standard models: $25,000-$150,000
Custom configurations: +20-50% premium
Factors affecting price:
Capacity requirements
Span length
Hoist type (wire rope vs. chain)
Automation level
Special environmental protections
2.4 Ideal Applications
Steel mills and foundries
Heavy manufacturing
Power generation plants
Large-scale assembly operations
Shipbuilding yards
3. Underhung Double Girder Bridge Cranes
3.1 Unique Design Characteristics
Dongqi’s underhung double girder bridge cranes offer:
Space-saving configuration utilizing building structure
Lower headroom requirements
Lighter weight construction
Flexible installation options
3.2 Technical Specifications
Parameter Specification Range Capacity 1-20 tons Span 5-30 meters Lifting Height 3-15 meters Work Class FEM 1Am-3m Operating Speed 2-20 m/min Control Options Pendant/Radio
3.3 Pricing Structure
Standard models: $15,000-$60,000
Custom solutions: +15-40% premium
Cost advantages:
Lower structural requirements
Reduced installation costs
Minimal foundation work needed
3.4 Ideal Applications
Automotive manufacturing
Warehousing and distribution
Food processing facilities
Light to medium industrial plants
Facilities with height restrictions
4. Key Differences Between Top Running and Underhung Models
4.1 Structural Comparison
Feature Top Running Underhung Support System Runs on elevated rails Suspended from ceiling Headroom Requirement Higher Lower Maximum Capacity 500+ tons 20 tons Span Limitations Up to 40m Up to 30m Installation Complexity Higher Lower
4.2 Performance Comparison
Aspect Top Running Underhung Hook Height Greater Limited Lateral Stability Superior Good Maintenance Access Requires platforms Easier access System Stiffness Very high Moderate Duty Cycle Capability Continuous Moderate
4.3 Cost Comparison
Cost Factor Top Running Underhung Initial Investment Higher Lower Installation Costs Significant Moderate Structural Support Requires heavy runway Uses building steel Maintenance Costs Comparable Comparable Total Cost of Ownership Higher Lower
5. Customization Options from Dongqi Crane
5.1 Standard Customizations
Capacity upgrades within design limits
Span adjustments to fit facility
Special coatings (epoxy, galvanized, stainless)
Control systems (pendant, radio, automated)
5.2 Advanced Custom Solutions
Explosion-proof configurations
High-temperature adaptations
Cleanroom-compatible designs
Multi-hoist systems
Automation integration
5.3 Special Features
Anti-sway technology
Load monitoring systems
Collision avoidance
Remote diagnostics
Energy recovery systems
6. Selection Guide for Industrial Buyers
6.1 When to Choose Top Running
Heavy load requirements (>20 tons)
High duty cycle operations
Need for maximum hook height
Outdoor or harsh environments
Long-span applications
6.2 When to Choose Underhung
Limited headroom facilities
Light to medium duty cycles
Existing structural support available
Budget constraints
Quick installation needs
6.3 Decision Factors
Load requirements (current and future)
Facility constraints (height, floor space)
Operational intensity (hours/day, lifts/hour)
Environmental conditions
Budget considerations
7. Dongqi Crane’s Manufacturing Excellence
7.1 Quality Assurance
ISO 9001 certified production
FEM 1.001 design standards
125% load testing protocol
Third-party inspection available
7.2 Engineering Capabilities
In-house R&D department
Advanced CAD/CAM systems
Finite element analysis
Prototyping facilities
7.3 Global Project Experience
5000+ cranes installed worldwide
Successful projects in 30+ countries
Industry-specific expertise
8. Maintenance & Service Support
8.1 Preventive Maintenance
Scheduled inspection programs
Lubrication services
Alignment checks
Electrical system testing
8.2 Repair Services
Emergency breakdown support
Component refurbishment
System upgrades
Retrofit solutions
8.3 Spare Parts Availability
Global inventory network
OEM quality components
Fast shipping options
Competitive pricing
9. Why Choose Dongqi Crane?
9.1 Competitive Advantages
30% cost advantage over European brands
50% faster delivery than industry average
100% design flexibility for special requirements
24/7 technical support worldwide
9.2 Customer Success Stories
Steel Mill Project: 200-ton top running crane
Automotive Plant: Underhung system installation
Warehouse Solution: Custom underhung design
Power Station: Heavy-duty top running crane
10. Getting Started with Your Project
10.1 Consultation Process
Initial needs assessment
Technical specification development
Proposal and quotation
Engineering review
Manufacturing and delivery
Installation and commissioning
10.2 Request a Quote
Provide your basic requirements to receive:
Preliminary specifications
Budgetary pricing
Delivery timeline
Configuration options
Contact Our Engineering Team Today: 📞 +86 18638815424 📧 sales010@cranesdq.com 🌐 https://www.craneyt.com/double-girder-bridge-cranes-top-running-vs-underhung.html
Keywords: Double Girder Bridge Crane, Top Running Double Girder Bridge Crane, Underhung Double Girder Bridge Crane, Industrial Overhead Cranes, Heavy Duty Lifting Solutions