The 15 ton single girder crane sold from China is installed in the Philippines

Homeالحالاترافعة علوية الحالات → The 15 ton single girder crane sold from China is installed in the Philippines

The 15 ton single girder crane sold from China is installed in the Philippines

15t single girder bridge crane installed in Philippines

Recently we concluded a turnkey project of four units’ الرافعات العلوية at Apalit Pampanga in the الفلبين. The client is a global top-tier company that focus on motor technology and engineering solutions. From crane design and consultation, synergy with steel structure supplier, crane production, seaworthy packing& shipping, onsite installation& commissioning to third-party inspection, we have earned client’s trust and satisfaction by delivering quality crane and creating value in each process.

Philippine factory requiring crane installation Crane equipment has been transported to the Philippine factory The crane will be installed soon The crane is being installed The engineers who are installing the crane

Problems needing attention before crane installation

During their site visit, the overhead crane installers will spend a good amount of their time reviewing the area where the crane will actually be installed. On a new construction project, they’ll start roping off the area to give the General Contractor an understanding of the area that they will need to be cleared out during the crane installation process.

The crane installers will also identify any equipment or machinery that needs to be moved out of the way so that their trucks and equipment can get onto the grounds of the facility, set up a staging area, and have free and clear ground access to the site.

During this site visit, the installers hope to speak with as many sub-contractors as possible, so they understand what the timeline is for construction and what other work might be going on around them during the install. They’ll need to consider the timing and installation windows of other items like:

  • Electric and gas line installation
  • Concrete or other masonry work being performed
  • Overhead light fixtures
  • Duct work / roofing work
  • Plumbing

For a crane going into an existing building structure, they’ll rope off or mark the area that they will be using for the installation. Typically, they have other sub-contractors spray or mark load ratings on the floor and structural supports so they can identify those once all of the equipment and trucks arrive.

The crane installer also makes note of any obstacles they may need to maneuver around and takes pictures of the building layout to share with their team so that they can develop an action plan. Some of these obstacles may include:

  • Identifying the type of flooring (concrete, dirt, etc.) and also understanding the load requirements for bringing in heavy-duty equipment and trucks
  • Identifying load requirements for structural support beams for existing runways
  • What equipment or machinery will be operational during the installation process and what employees, if any, will be working near or around the area?

More Overhead Crane cases in the Philippines

كيفية تخصيص النفقات العامة رافعة من الصين

نحن رافعة المصنعة يقع في الصين ، توفير رافعة خدمات التخصيص العالمية رافعة العملاء. إذا كنت ترغب في تخصيص النفقات العامة رافعة, يمكنك ترك رسالة على الموقع أو البريد الإلكتروني: sales010@cranesdq.comقل لنا المعلومات التالية ، مدير المبيعات لدينا بالاتصال بك:

  • رفع السعة (طن): __ ?( السعة)
  • رفع الارتفاع (م):__ ? (الطول من هوك مركز الأرض)
  • Span (م): __ ? (المسافة بين مركز السكك الحديدية)
  • سرعة رفع (م/دقيقة): __ ? ( مفردة ، مزدوجة ، متغير)
  • السفر المسافة (م): __ ? (طول السكك الحديدية)
  • العمل: __ ? (كم عدد ساعات اليوم ؟ كم مرة ساعة؟)
  • ما المواد التي سيتم رفع: __ ?
  • الصناعية الجهد: __ ? ( مثل :380V, 50Hz, 3ph )

يمكنك إما ملء نموذج الاتصال أو مراسلتنا على البريد الإلكتروني. بعد تلقي استفسارك وسوف نتصل بك في أقرب وقت ممكن وتقديم عرض مناسب.

ارسال الاحتياجات الخاصة بك