The 15 ton single girder crane sold from China is installed in the Philippines

Homeคดีอยู่เหนือศีรษะคดีรถเครน → The 15 ton single girder crane sold from China is installed in the Philippines

The 15 ton single girder crane sold from China is installed in the Philippines

15t single girder bridge crane installed in Philippines

Recently we concluded a turnkey project of four units’ เครนเหนือศีรษะ at Apalit Pampanga in the ฟิลิปปินส์. The client is a global top-tier company that focus on motor technology and engineering solutions. From crane design and consultation, synergy with steel structure supplier, crane production, seaworthy packing& shipping, onsite installation& commissioning to third-party inspection, we have earned client’s trust and satisfaction by delivering quality crane and creating value in each process.

Philippine factory requiring crane installation Crane equipment has been transported to the Philippine factory The crane will be installed soon The crane is being installed The engineers who are installing the crane

Problems needing attention before crane installation

During their site visit, the overhead crane installers will spend a good amount of their time reviewing the area where the crane will actually be installed. On a new construction project, they’ll start roping off the area to give the General Contractor an understanding of the area that they will need to be cleared out during the crane installation process.

The crane installers will also identify any equipment or machinery that needs to be moved out of the way so that their trucks and equipment can get onto the grounds of the facility, set up a staging area, and have free and clear ground access to the site.

During this site visit, the installers hope to speak with as many sub-contractors as possible, so they understand what the timeline is for construction and what other work might be going on around them during the install. They’ll need to consider the timing and installation windows of other items like:

  • Electric and gas line installation
  • Concrete or other masonry work being performed
  • Overhead light fixtures
  • Duct work / roofing work
  • Plumbing

For a crane going into an existing building structure, they’ll rope off or mark the area that they will be using for the installation. Typically, they have other sub-contractors spray or mark load ratings on the floor and structural supports so they can identify those once all of the equipment and trucks arrive.

The crane installer also makes note of any obstacles they may need to maneuver around and takes pictures of the building layout to share with their team so that they can develop an action plan. Some of these obstacles may include:

  • Identifying the type of flooring (concrete, dirt, etc.) and also understanding the load requirements for bringing in heavy-duty equipment and trucks
  • Identifying load requirements for structural support beams for existing runways
  • What equipment or machinery will be operational during the installation process and what employees, if any, will be working near or around the area?

More Overhead Crane cases in the Philippines

วิธีปรับแต่ง Overhead Crane จากประเทศจีน

เราเป็น ผู้ผลิตรถเครน ยังตำแหน่งประเทศจีนในกรณีที่รถเครน customization การบริการต้องโกลเบิลเครนลูกค้าไปเลย ถ้าคุณต้องการปรับแต่งเป็นอยู่เหนือศีรษะเครนคุณสามารถฝากข้อความบนเว็บไซต์หรือ อีเมล:sales010@cranesdq.comบอกพวกเราทำตามข้อมูลของเราและการขายตัวจัดการจะติดต่อคุณ:

  • ความสามารถในการยก (ตัน): __ ?( ความจุที่กำหนด)
  • ระยะยกสูง (ม.):__ ? (ความสูงจาก) ตะขอ ศูนพื้น)
  • ช่วง (ม.): __ ? (ระยะห่างระหว่างศูนย์กลางราง)
  • ความเร็วในการยก (ม./นาที): __ ? (เดี่ยว, คู่, ตัวแปร)
  • ระยะการเดินทาง(ม.): __ ? (ความยาวของราง)
  • หน้าที่การงาน: __ ? (กี่ชั่วโมงต่อวัน? กี่ครั้งต่อชั่วโมง?)
  • ต้องยกวัสดุอะไร: __ ?
  • รองอุตสาหกรรม voltage:__? (เช่น:380V,50Hz,3ph)

คุณจะต้องป้อนข้อมูลที่ติดต่อแบบฟอร์หรือส่งอีเมล์. หลังจากได้รับข้อกล่าวหาของคุณเราจะติดต่อคุณทันทีที่เป็นไปได้และให้คุณอยู่กับคนเหมาะสมข้อเสนอ

ส่งของคุณต้องการ