Because of COVID-19, our engineers are unable to help overseas customers to install derek di atas kepala. In this case, we will provide customers with the most detailed installation instructions and provide online guidance. If we have local partners, we can also invite partners to guide the installation. Today we want to share the installation of a 10 ton overhead crane from the Filipina
In order to fix the track of bridge crane, each track is connected one by one with splint, and then the rail is locked on the bearing capacity by pressing plate or bolt. At the same time, the track distance is measured to match the span of the crane beam. If there is any error in the bearing beam level, steel plate should be added to ensure the track installation level. AC speed regulation system generally adopts thyristor stator voltage regulation, energy consumption braking, eddy current braking, hydraulic push rod braking, multi speed motor and dual motor schemes. The capacity of the motor, resistor and other primary components of the speed regulation system should be selected and checked according to the actual working conditions. When the hydraulic push rod brake is used to improve the speed regulation of the tissue, the support brake should be provided.
Kami adalah produsen derek terletak di Cina, menyediakan layanan penyesuaian derek untuk pelanggan derek global. Jika Anda ingin menyesuaikan Derek di Atas Kepala, Anda dapat meninggalkan pesan di situs web atau Email: sales010@cranesdq.com, beri tahu kami informasi berikut, dan manajer penjualan kami akan menghubungi Anda:
Anda dapat mengisi formulir kontak atau mengirimkan email kepada kami. Setelah menerima pertanyaan Anda, kami akan menghubungi Anda sesegera mungkin dan memberi Anda penawaran yang sesuai.
2 Comments so far
JamesPosted on11:29 am - Mei 30, 2022
2 units overhead crane, 3t-15m-8m, 1 unit, 3t-19m-5m, 1 unit, 10t-19m-5m
If it is convenient, please give me a quote as soon as possible
LudyPosted on1:53 pm - Jan 12, 2024
Hello, I am the purchaser of Yongxin Power Plant in Vietnam. We are currently looking for a quotation for a 10 ton overhead crane and hope to receive relevant information and costs. In the past procurement, it took us about 30-45 days to purchase and install a 10 ton bridge crane. Do you have a faster delivery time? Can you dispatch a professional team of engineers to Vietnam for installation and debugging to ensure the normal operation of the equipment.